pastry cooling transit belt
cookie_pastrycookie_pastry2cookie_pastry3pastry cooling transit belt

Cookies pastry cooling system

  • Transit length: 8 Meters
  • Manufacturing lead time:  10-15working days
  • Domestic transit to sea port:  5 days
  • Shipping time on sea:  Depends on different countries
  • Payment:  Bank T/T,  L/C at sight

Product Description

Main Features:

When oil-sprayed biscuits were finished, put them on this transmission system for cooling.

Inquire Now: